NEW FOUNDATIONS

New Slab and Foundation Contractors in Houston

Westec Construction works as foundation contractors in Houston for new construction: slabs and foundations for room additions, detached garages, shops, outbuildings, new homes, and commercial pads. This page is about building a new foundation. If you need work on an existing one, see foundation repair or pier and beam foundation repair.

A concrete slab in Houston has to be designed for clay that swells in a wet spring and shrinks hard in August. We build to the engineer's plan, hold the inspections, and pour on a prepared pad with drainage figured out before the first form stake goes in. Estimates are free, and every foundation carries our workmanship guarantee.

New foundations we build

Every foundation we pour is built from an engineer's plan sized to the building and the soil under it. The type depends on what is going on top, how the lot drains, and whether the floor needs to sit above grade.

Monolithic slab on grade

The footing and the floor are poured as one piece with a thickened edge around the perimeter. It is the fastest and simplest slab for a detached garage, a shop, or a small addition where the engineer is comfortable with a single pour.

Conventional rebar slab with grade beams

A grid of rebar in the slab, with deeper reinforced beams trenched under the perimeter and across the interior on the engineer's spacing. The beams stiffen the slab against seasonal soil movement. It is a common choice for additions, garages with living space above, and small commercial buildings, and the easiest type to tie into an existing foundation.

Post-tension slab

Steel cables in plastic sleeves run through the slab and are tensioned after the concrete reaches strength, which squeezes the whole slab into one stiff unit. Post-tension is the standard for new homes on Houston clay because it handles shrink and swell with less excavation than a deep-beam design. It needs a tensioning crew, so it is usually reserved for whole houses and larger buildings.

Pier and beam for raised homes

Concrete piers with beams and a framed wood floor above a crawlspace. Pier and beam is the right call where the floor needs to sit well above grade or the owner wants access under the house. In the Heights historic district, the city's guidelines ask new houses to read as pier and beam, so even a slab there gets detailed with a raised floor and vents.

Drilled piers and commercial pads

Heavier loads or deeper clay can call for drilled concrete piers under the grade beams. We also pour slabs and pads for metal buildings and retail shells through our commercial work.

Site prep on Houston clay

Much of Houston and Fort Bend County sits on Lake Charles clay over the Beaumont Formation. It holds water, swells when it is wet, and shrinks and opens up at the surface in a dry summer. Katy, Cypress, and the northwest side sit on loamier soils of the Lissie Formation, which drain differently and move less. The engineer's design starts with the soil, and so does our site prep.

Soil report and stamped plans

New homes and commercial pads usually get a geotechnical report with borings on the lot, and the engineer designs the beams, steel, or cables from it. Smaller projects like a garage slab are designed to the soil conditions the engineer already knows for the area. Either way, we build from a stamped plan, not a rule of thumb.

Select fill and compaction

Where the plan calls for it, we cut out the top layer of clay and bring in select fill, placed in lifts and compacted, so the slab sits on a stable, uniform pad. On a flat lot this also raises the finished floor above the surrounding grade.

Moisture conditioning

A pad that is bone dry when it is poured will swell under the slab the first wet season. We wet and work the subgrade ahead of the pour so the moisture under the slab is close to where it will stay year-round.

Drainage and trees

Finished grade falls away from the slab on every side, downspouts discharge past the pad, and on tight lots we add swales or drains so water never ponds against the beam. Big oaks pull a lot of water out of the clay, so a slab poured right up against one sees drier soil on that side, and the layout accounts for that.

Engineering, inspections, and the pour

A new slab is mostly sequencing. Each step gets checked before the next one covers it up.

  1. Site visit and free estimate

    Bryson walks the lot, looks at access, drainage, and any existing structure, and gives you a written scope.

  2. Engineering

    A structural engineer designs the foundation and stamps the plan. For a new home or commercial pad that starts with a soil report.

  3. Permits

    Inside Houston city limits, plans go through the Houston Permitting Center. In unincorporated Harris County, the County Engineer issues the development permit. HOA review runs at the same time.

  4. Layout and pad

    The corners are staked, and the pad is cut or built up with select fill, compacted, and brought to grade.

  5. Plumbing rough-in

    Drain lines, water, and any sleeves are trenched into the pad and stubbed up where the walls will be. This is inspected before it is buried.

  6. Forms, steel, and pre-pour inspection

    Beams are trenched, forms set, vapor barrier laid, and rebar or post-tension cables placed on chairs. The inspector looks at all of it before the pour.

  7. Pour and finish

    Concrete is pumped or placed, consolidated, screeded, and finished flat, with anchor bolts set per the plan.

  8. Cure, tensioning, and handoff

    Forms strip after a few days. Post-tension cables are stressed once the concrete reaches strength. Then framing starts.

Tying an addition to an existing slab

Much of our foundation work is for home additions, which means the new slab has to meet the old one cleanly. The engineer specifies how: usually a new grade beam along the shared edge, rebar dowels epoxied into the existing beam, and a finished floor set to match the house so the threshold is flush.

The two slabs were poured years apart on clay that moves, so they will never move exactly together. A good tie-in accepts that: the joint is detailed so finishes can take a little movement, drainage on the addition side is rebuilt so the old beam does not sit in water, and plumbing for a new bathroom or kitchen goes under the new slab before anything is poured.

Top-down drone view of residential lots, driveways, and roofs

What drives the cost

We quote from the plan and a site visit. These are what move the number on a new foundation.

Footprint and shape

Square footage sets the concrete and steel. Lots of corners mean more beam length and forming than a simple rectangle.

Foundation type

A monolithic garage slab is simpler than a post-tension house slab or a pier and beam system with a framed floor.

Beams and soil prep

Deeper or closer beams, select fill, and extra compaction all come from the engineer reading the soil.

Plumbing under the slab

A shop with a floor drain is quick. A new home with three bathrooms is a lot of trenching and inspection before the pour.

Access and elevation

Pump trucks, long hose runs, tight backyards, and raising a pad for a flood zone add equipment and fill.

Engineering and permits

Soil borings, the stamped design, inspections, and permit fees are part of the job, not extras.

Foundation contractors in Houston: why Westec

Westec Construction is owner-run by Bryson Oglesby, and he is on site for the inspections and the pour. We build residential and commercial, we are open 24 hours a day, 7 days a week, and every foundation carries our workmanship guarantee.

  • Free estimates with a written scope
  • 10% off jobs over $2,500
  • $100 referral bonus, paid after the job is complete.
  • Based in Richmond, serving Houston, Katy, Cypress, Richmond, Conroe, The Woodlands, Sugar Land, and Fulshear (all service areas)

Because we are a general contractor, the same crew can carry the job past the slab into new construction or an addition, and we pour driveways and flatwork through our concrete page. Read our reviews, then request a free estimate.

CURRENT OFFER10% off jobs over $2,500.

Mention it when you request your free estimate. It appears on your written scope before any work begins. Offer terms.

Workmanship guarantee included. If our work does not hold up to the standard we promised, we come back and make it right. Details.

New Foundations questions

How long does a new foundation take?

Plan on a few weeks for engineering, permits, and HOA review before anything happens on the lot. Once we mobilize, a garage or addition slab is usually a week or two of pad work, plumbing, forming, inspections, and the pour. A full house slab takes longer. Concrete needs several days before forms strip and framing starts.

Post-tension or rebar: which one do I need?

The engineer decides, but the pattern is simple. Post-tension slabs are the norm for new homes on Houston clay because the tensioned cables make the whole slab act as one stiff plate. Conventional rebar slabs with grade beams are common for additions, garages, shops, and small commercial, and they are easier to tie into an existing house.

Do I need an engineer for a garage or shop slab?

If the slab carries a building, yes. Permit offices expect a stamped plan, and on expansive clay the beam layout and steel are not something to guess at. For a small detached shop the engineering is quick. A pad for an AC unit or a shed with no permanent structure is flatwork, and that lives on our concrete page.

What permits does a new concrete slab need in Houston?

Inside Houston city limits, the project is permitted through the Houston Permitting Center, and the under-slab plumbing and the forms and steel are inspected before the pour. In unincorporated Harris County, every development needs a county permit, and fill inside a special flood hazard area needs engineer or architect documents. HOAs review the plans too. We handle all of it.

What should I do about drainage around a new slab?

Keep water moving away from it in every direction. We set the finished floor above the surrounding grade, slope the dirt away from the slab, and extend downspouts past the pad. Afterward, keep beds and sprinklers from soaking one side of the house more than the other, because uneven moisture is what moves clay.

Do you build pier and beam foundations for new houses?

Yes. A raised foundation makes sense where the floor needs to sit above grade, where you want crawlspace access to plumbing, or in neighborhoods like the Heights where the design guidelines want new houses to read as pier and beam. We pour the piers and beams and frame the floor system.

FREE ESTIMATE

Tell us about the job

Send a few details and Bryson will reach out to set up a free estimate. Prefer to talk? The phone is answered 24 hours a day, 7 days a week.

  • Free estimates, residential and commercial
  • Workmanship guarantee on every job
  • $100 referral bonus, paid after the job is complete.

Ask about 10% off jobs over $2,500. Confirmed on your written estimate.

Prefer to talk? Call or text (281) 809-0006, any time.