Demolition Companies in Houston, TX | Westec Construction
Drone view of a subdivision street, rows of homes, and an open lot
DEMOLITION

Demolition Company in Houston

Westec Construction is one of the demolition companies in Houston that also builds, and that changes how we tear things down. We take down houses, garages, commercial interiors, pools, slabs, and driveways in Houston, Katy, Cypress, Richmond, Conroe, The Woodlands, Sugar Land, and Fulshear, and we leave the lot graded and ready for what comes next.

Demo day is the easy part. The real work is the utility disconnects, the permit, the asbestos survey, and the haul-off, and we handle all of it. Estimates are free, and the same crew can pour the new foundation once the lot is clear.

Demolition services

We run our own equipment and crews for everything below, from a single wall to a whole house, and we size the machine to the job.

House demolition

Whole-house demolition in Houston is usually one of three stories: a teardown for a new build, a house that flooded one too many times, or a fire. We take the structure down, break out the slab or leave it per your plan, and haul everything off. Garages, barns, sheds, and mobile homes are handled the same way.

Commercial demolition

Interior strip-outs for retail and restaurant build-outs, small freestanding buildings, canopies, and parking lot removal. Commercial demolition in Houston often runs after hours or in phases so the neighbors in a strip center stay open; see our commercial work page for the rest.

Interior and selective demolition

Gutting a kitchen or bathroom, opening up walls, taking a flooded house back to the studs, or stripping a whole interior ahead of a remodel. Selective work is about what stays: we identify load-bearing walls, shore before we cut, protect what remains, and keep the dust inside plastic.

Pool, slab, and driveway removal

Pools come out as a partial break-and-fill or a full shell removal. Slabs, driveways, and patios are broken out, loaded, and hauled, and the ground is left compacted and graded. If a new driveway is going in, our concrete crew pours it.

Before the excavator shows up

Most of the delays on a demolition job happen before anyone swings a bucket. Here is what has to be done first.

  • Utilities off: electric and gas disconnected at the meter, water shut off, and the sewer line capped.
  • Permit: inside Houston city limits a demolition permit runs through the Houston Permitting Center. In unincorporated Harris County no demolition permit is required, but you need a county permit before you rebuild.
  • Asbestos survey: older structures should be surveyed before demolition, and any asbestos-containing material is abated before the machine arrives. We line this up.
  • Deed restrictions and HOA: if your neighborhood has an architectural committee, tell them about the demolition and the rebuild plan early.
  • Neighbors and trees: we fence the site, protect trees you want to keep, control dust with water, and give the neighbors the schedule.
  • Salvage: anything you want kept, from doors and fixtures to a brick pile, is pulled before demo day.

How a demolition job goes

From first call to a clean lot, this is the order.

  1. Site visit and free estimate

    Bryson looks at the structure, access, what is staying, and where utilities are, then sends a written scope.

  2. Survey and permits

    Asbestos survey, permit application, and HOA notice run in parallel. This is the longest part of the schedule.

  3. Utilities and salvage

    Services are disconnected and capped, and anything you want saved comes out.

  4. Mobilize and protect

    Equipment and containers arrive, fencing goes up, and trees and neighboring structures are protected.

  5. Demolition

    The structure comes down, usually in a day or two for a single-story house, with water on the pile for dust.

  6. Sort and haul

    Concrete, metal, and clean wood are separated where it makes sense; the rest goes out in roll-offs.

  7. Grade and hand off

    Holes are backfilled and compacted, the lot is graded to drain, and we walk it with you.

From teardown to rebuild

A cleared lot is only ready if the next contractor can start on it, and since we are usually that contractor, we grade for the foundation rather than for looks. Fill goes in compacted lifts, old footings and pool shells are out, the slab is removed unless the engineer wants it left, and the lot drains away from where the new building will sit.

In unincorporated Harris County, every development needs a county permit before rebuilding, and fill brought into a special flood hazard area needs engineer or architect documents. Inside Houston city limits the new building permit runs through the Houston Permitting Center. We handle that handoff so the new foundation and the new build start without a gap.

Worker installing a large window on the upper floor of a white building, with scaffolding beside it

What drives the cost

Every demolition is quoted from a site visit. These are what move the number.

Size and construction

A frame house comes down faster than brick or block, and two stories mean more volume to haul.

Asbestos

If the survey finds it, abatement happens first and adds both time and a separate crew.

Slab and foundation removal

Leaving a slab is cheaper than breaking it out, but most rebuilds need it gone.

Access and haul distance

Tight lots, overhead lines, and a long run to the roll-off slow the machine down.

Hand work

Selective and interior demolition is labor, not machine time, and the more that stays, the more careful it gets.

Permits and disconnects

Permit fees, utility disconnect scheduling, and backfill and grading are part of the scope.

Demolition companies in Houston: why Westec

Westec Construction is owner-run by Bryson Oglesby, who scopes the job and is on site when the machine starts. We handle residential and commercial, we are open 24 hours a day, 7 days a week, and our workmanship guarantee covers the grading and backfill we leave behind.

  • Free estimates with a written scope
  • 10% off jobs over $2,500
  • $100 referral bonus, paid after the job is complete.
  • Based in Richmond, serving all of our service areas

Read our reviews, then request a free estimate and tell us what needs to come down.

CURRENT OFFER10% off jobs over $2,500.

Mention it when you request your free estimate. It appears on your written scope before any work begins. Offer terms.

Workmanship guarantee included. If our work does not hold up to the standard we promised, we come back and make it right. Details.

Demolition questions

Do I need a permit to demolish a house in Houston?

Inside Houston city limits, yes. The demolition permit runs through the Houston Permitting Center, and we pull it as part of the job. In unincorporated Harris County, which includes much of Cypress, no demolition permit is required, but a county development permit is needed before you rebuild. Other cities have their own rules, and we check before we quote.

Does the house need an asbestos survey first?

If it is an older structure, plan on it. Floor tile, mastic, pipe insulation, and siding in older houses can contain asbestos, and a survey before demolition tells us whether any of it has to be abated by a specialty crew first. We schedule the survey and the abatement so it does not hold up demo day longer than necessary.

How long does it take to demolish a house?

The machine work on a single-story house is usually a day or two, with another day or two for sorting, hauling, and grading. The calendar is driven by the front end: the asbestos survey, the permit, and utility disconnects can take a few weeks. We build those lead times into the schedule.

Do you remove the slab or leave it?

Your call, and it depends on what is next. A rebuild almost always wants the old slab out so the new foundation can be engineered on prepared soil. If the lot is going to sit for a while, leaving the slab saves money now, but it will have to come out later. We quote it both ways.

Can you gut the inside without touching the exterior?

Yes. Interior demolition is a big part of our remodeling work: kitchens, bathrooms, flooring, drywall, and non-bearing walls come out while the roof, exterior walls, and anything you want kept stay protected. We identify load-bearing walls before anything is cut and shore where needed.

How does pool removal work?

Two options. A partial removal breaks the top of the shell down, punches drainage holes through the bottom, and backfills in compacted lifts. A full removal takes the entire shell out. Full removal costs more but leaves a lot you can build on. Either way the ground is compacted and graded so it does not sink.

FREE ESTIMATE

Tell us about the job

Send a few details and Bryson will reach out to set up a free estimate. Prefer to talk? The phone is answered 24 hours a day, 7 days a week.

  • Free estimates, residential and commercial
  • Workmanship guarantee on every job
  • $100 referral bonus, paid after the job is complete.

Ask about 10% off jobs over $2,500. Confirmed on your written estimate.

Prefer to talk? Call or text (281) 809-0006, any time.